-

Considerations in Mounting DIN Rail Inside Datacenter Racks
Automation is moving into the datacenter. It’s cleaner, cooler, and closer to the IT infrastructure. But there are quite a few gotcha’s…
-

Suffering from Ambiguous Automation Projects?
Determining where to start is critical; trust us to help get you set on the path to success. We’ll be there for…
-

S88 Batch Considerations
When designing a set of S88 Batch phases, consider the intended use of the equipment. Expectations for a Process Development line are…
-

New Year, New Panels
The first panels of the new year are just about ready to ship! Special thanks to Buckles-Smith Electric, Rockwell Automation, and Panduit…
-

Rockwell Automation Fair in Chicago
Lucid has boots on the ground in Chicago for the Rockwell Automation Fair!
-

Industrial IT/OT Zero Trust
Manufacturing network boundaries are becoming fuzzy as external business applications requiring trusted access to plant data perforate the once rigid perimeter.
-

Industrial NES Controller – Intern Project
Here is a preview of our intern training project under way. Natalie Rusca and Robert Orta made good progress on the hardware,…
-

PLC to SQL, Why Would I?
There exists a gap between the process historians and ODBC-enabled batch/SCADA services to get PLC tag data into a SQL database.
-

GMP Process Solutions
GMP Process Automation is much more that just “Getting it working”, the right experience saves critical time at the end of a…
-

Prepared To Visualize Your Data – RtReports
RtReports are built to address the needs of Biotech and Pharmaceutical Processes. There are many data visualization solutions out there, contact us…
Work with Lucid
Have a project in mind?
Compliance is time-consuming — we make sure automation doesn’t make it harder. Talk to an engineer about your next skid, upgrade, network or validation package.
